Al Diyar
January 27, 2016
Al Jaber Group
January 27, 2016
Client:

AL Habtoor Leighton

Task:

Project contain 5 buildings (10 floors) and mall (steel structural), podium, 3 basement, tunnels and pedestrian bridges.

  • GA Shop Drawings
  • Re-bar Shop drawings.
  • Structural calculation design ( Hoist foundation and ties connection, Tour cranes foundation and ties connection, Mockup building design, design and verification analysis for slabs under several movement loads, . . .)
  • Value Engineering studies to reduce the rebar reinforcement in slabs, and to comber the post tension slabs with the traditional one.